});

Instructional Videos

Installing and Using the Lock-N-Load® AP

(Pop-up blockers may need to be disabled)

Step 1: Mounting The Lock-N-Load® AP


View Video

 

Step 2: Shell Plate Installation


View Video

Step 3: Priming System Setup and Change Over


View Video

 

Step 4: Preparing the Case Activated Powder Measure


View Video

Step 5: Mechanical Operation and Lubrication


View Video

 

Step 6: Preparing New Dimension™ Dies


View Video

Step 7: Die and Case Activated Powder Measure Setup


View Video

 

Step 8: Lock-N-Load® Automatic Case Feeder Setup


View Video

Step 9: EZJect™ Ejection System


View Video