Instructional Videos
Installing and Using the Lock-N-Load® AP
(Pop-up blockers may need to be disabled)
Step 1: Mounting The Lock-N-Load® AP |
Step 2: Shell Plate Installation
|
|
Step 3: Priming System Setup and Change Over
|
Step 4: Preparing the Case Activated Powder Measure
|
|
Step 5: Mechanical Operation and Lubrication
|
Step 6: Preparing New Dimension™ Dies
|
|
Step 7: Die and Case Activated Powder Measure Setup
|
Step 8: Lock-N-Load® Automatic Case Feeder Setup |
|
Step 9: EZJect™ Ejection System |









